Footloose

Footloose was built in two weeks and was put up during a 3 day change-over. This show consisted of four "areas"  on the stage where platforms stayed to signify scenes throughout the show. There were items that flew in and out and many props and furniture that came on and off between scenes. This show I was a carpenter/electrician and was the light board operator. 

*Click on any photo to open the gallery

Cowboy Bob's Sign Process
Coyboy Bob's Insets
Cowboy Bobs Bar-B-Que Header
Corbal cut out for header
Bomont Town Hall Header
Burger Blast Sign and Table
Bottom Bun
Toppings
Complete burger
Arc for burger sign lettering
Burger Sign
Main Table at Burger Blast
Rings on burger joint tables
foam edging on table
Burger Blast Table
Frame of Bridge Base
Frame from a Different Angle
Covering Process
Bridge Platform
Church/House Base Platform
Church Steeple and Platforms
Church/House Platforming
Church Steeple Header